| NAMA KEGIATAN | PEMBANGUNAN JALAN PAVING BLOK |
| LOKASI KEGIATAN | DUSUN TANAH BERU |
| VOLUME | METER |
| WAKTU PELAKSANAAN | HARI |
| ANGGARAN | Rp. 12.075.000 |
| SUMBER DANA | DANA DESA (DD) T.A 2025 |
| PELAKSANA | TPK DESA TOMPOTANA |
| NAMA KEGIATAN | PEMBANGUNAN JALAN PAVING BLOK |
| LOKASI KEGIATAN | DUSUN TANAH BERU |
| VOLUME | METER |
| WAKTU PELAKSANAAN | HARI |
| ANGGARAN | Rp. 12.075.000 |
| SUMBER DANA | DANA DESA (DD) T.A 2025 |
| PELAKSANA | TPK DESA TOMPOTANA |